|
马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。
您需要 登录 才可以下载或查看,没有账号?免费注册用户名
×
The organization shall identify key process equipment and provide resources for machine/equipment maintenance and develop an effective planned total preventive maintenance system. As a minimum, this system shall include the following:
. A; w p3 z# c1 u, e8 }- planned maintenance activities; : T! B5 \3 u/ f% ?, c3 R
- packaging and preservation of equipment, tooling and gauging; $ b! f& h1 Q8 g r" }
- availability of replacement parts for key manufacturing equipment;
/ x# O/ y; p1 ^8 g* [6 q- documenting, evaluating and improving maintenance objectives. ) Z P) A7 |) ^* Q2 E, r: p
The organization shall utilize predictive maintenance methods to continually improve the effectiveness and the efficiency of production equipment.
, g5 Z F+ ]4 D2 kFailure:
% e0 C: ]9 }' g h/ JEquipment preventive maitenance process was not implemented effectively.
6 U+ I L+ N t/ J0 R5 ^5 E; ^Evidence:
" `% R( S( E- oThe identification and documentation of replacement parts availability process were not well done.Eg. the equipment Hydraulic Semi-automatic machine 213. |
|